SA Water – Murray Mouth Dredging

Birdon was also the selected as Prime Contractor for South Australia Water Corporation’s contract for maintenance dredging of the Murray Mouth from 2007 until flood waters negated the need for continual dredging in 2010.
This was a cutter suction dredge operation plus booster pump operating around the clock. The contract was a turn key solution involving provision of all plant, equipment labour and services including construction of pipeline, operation of cutter suction dredge, booster, workboats plant machinery and associated equipment and vessels.

Murray Mouth